Work Plan

Loki Crews

July 2, 2026: Jake, Clinton, Auri, Dimo

AM

  1. Support BCWS crews with loading of bucked firewood from back corridors. Load dump trailer and Loki truck. Jake will provide chipper maintenance during this time.

  2. Process material at east-end to completion. Pile for chipping, add to waste piles, buck stumps low, process firewood. Jake will deliver firewood loads during this time.

    PM

  3. Support BCWS crews at back-end corridor once they have material prepped. Operate chipper and deliver mulch loads.

  4. Syfchuck to focus on loading and hauling waste material from main landing and eastern area, as well as focus on consolidating log decks for the log-truck. Goal is to have eastern area looking close to completion by end of day. Feel free to add some of the mulch-mat to the waste loads.


Deliveries

Next mulch load goes to: Sydney Grace - 13527 Balfour-Kaslo-Galena Bay Highway - “Please drop them off at the house above the old train station to the left. It’s an old cabin, they can go to the left of the driveway at the entrance.”

Next dump trailer bucked load goes to: Pam Donaldson - 14130 Hwy 31, Howser - "We're the first driveway on the right after the bridge over the Lardeau River, driving north."

Next dump trailer unbucked load goes to: Jim Lawrence - 12815 Hwy 31, Cooper Creek - 250-366-4649

Next log truck load goes to: Samantha Blythcoates - 125 Cooper Creek Road - 208-425-7062