Timeline and Hours of Work:

  • Work has been reduced to final phases of clean-up work; personnel currently limited to equipment operators.

  • Tapering of pace to ensure budget requirements are met as project nears completion.

Summary of Work Plan

Equipment:

  • Caterpillar 3.5 ton mini-excavator / 14’ dump trailer

  • Kubota Tractor Forwarder / Self-loading trailer

  • BC1200XL Wood chipper / 1-ton dump truck

  • Pioneer 520 UTV

  • Self-Loading Log Truck / Short hauler

Concluding Phases:

  • Syfchuck will spend July 17, 2026 forwarding firewood logs from the western corridors to their destination.

  • Loki tree crews will schedule one further day for patrolling the site to clean up the following:

    • cut high stumps and swamp remaining random chunks

    • rake and gather small accumulations of sticks and fine fuels for transport as waste

    • buck flat and finesse some of the CWD, and rehab trails where possible

    • Load remaining firewood rounds

  • Loki recruits will use their seasonal wildfire orientation day to provide some courtesy services such as:

    • Bucking and loading remaining firewood at landing

    • Delivering bucked firewood to residents who were initially promised

  • Large volume of logging slash underneath the pulp and firewood at the landing requires clean-up

  • Hand-piled burned piles require ignition and consumption in the Fall/Winter of 2026

project metrics:

  • Free mulch loads delivered within community: 29

  • Dump Trailer loads delivered: 12

  • Log Truck loads delivered: 5

  • Approximate total cords of firewood removed from site: 90

  • Approximate yards of forest waste removed: 400

Progress Photos

Gallery 1 - Strategies

Gallery 2 - Windthrow Area:

Gallery 3 - Back Corridors

Gallery 4 - East Access Area

Gallery 5 - Before and After Examples



Gallery 6 - Still To Do:

Gallery 7 - unable to achieve

Please use the following links to find updated site documents:

Emergency Response Plan

First Aid Assessment Worksheet

Georeferenced Map

Pre Work Meeting

Notice of Project

Site Hazard Assessment Form

Daily Meetings

Danger Tree Assessment

Timbermark

Confirmation of Insurance (incl. additionally insureds)

WCB Clearance Letter

Progress Photos


What to Bring:

Links

Company Safety Documents